Unless your admin has removed it, the Home page will have 'Timesheet' as one of the options. Technicians can edit their own timesheet. Administrators can edit themselves and others.
Totals are shown at the top and contain all the totals from the live rows. Rows you are 'thinking about' adding from the "Possible Entries" don't count into the daily counts until you commit them (hit the save button). You can edit them after you commit them.
If you have times in WOs for this week, at the top you will see a section with a header "Actual Entries"
In many cases, all you need is to adjust/add/delete times in that set.
The image above shows 3 rows with changes (see the "3" in the bullet as well), and it shows 2 changes on the 1st row. Once you are happy with your changes, press the save button (highlighted) If you want to start over, the reload button, also highlighted at the very top, will erase your changes and let you start over.
The 1st 'Possible Entries' row is blank for you to pick a work order and other values. Until you have on the row a work order and one hour value (can be a fraction of an hour such as 0.2, it doesn't have to be an integer), the row is not ready to be saved.
The row below is not ready because it doesn't have a WO picked
The row below is not ready because it doesn't have any hours entered
A comment isn't enough you need hours:
Once it is ready to be saved the row will show up with green strips (Since color deficiencies aka color blindness is either red/green or blue/yellow, the steel grey/blue switching to green should be visible to most people.)
The icon beside the row(s) save button shows how many rows will be saved. 1 in the example below:
and two in the example below:
The following buttons let you move to 'today', or move back or forward one week at a time.
If you have an admin level license, you will be able to edit the timesheets for others.